Investment areas covered by the local zoning plan. Developed with storm water drainage, sewerage and water mains systems, plus a fibre optic IT bus. LV power connection with a capacity of 1 MW, expandable to 3 MW.
Currently, out of an area of almost 12 ha, there is only 1.0286 ha of investment land left to be bought out for business development.